Wednesday, September 24, 2008

Kitchen going in.

Here are pictures of the painting and installation of the kitchen cabinets. Many thanks to my brother-in-law Jim for his expertise.







Tuesday, August 19, 2008

Stain and sheetrock finished.

Still staining. This is a two coat system using Sikkens Cetol
Log and Siding. We are brushing it on for reason I can't explain.
It is tedious work and we have to do it twice.

The second coat starts to make the logs shine.
Benny after a hard day playing in the mud.

Septic finishing up. Thanks Ken!

Julie enjoying a much needed break.

Sheetrock is done. The guys at Stokesberry Drywall 
did an awesome job!!





Giant Master Bedroom.


Sunday, June 29, 2008

Board and batten complete...Starting to Stain.

Board and batten on dining room bump-out.
 The lower half will be rock.

Board and batten complete.


Julie applying exterior stain. This is the Sikkens 
Cedar color.

The deep crawl came in handy for our mechanical stuff.

HVAC going in.

Monday, May 19, 2008

Metal roof done, moving on to cleaning logs.

Exposed timbers with electrical.

Front Entry
Cleaning logs.




Second Floor Framing
Benny and his "Robot"

Monday, April 21, 2008

New Progress


Front porch being installed.

Window bucks installed.

I'm starting to run electrical, yeehaaa!

Second floor 2x6 tongue and groove going in.

We finished staining the garage. We like this color and will probably use it on the log home.

Sunday, April 06, 2008

The first dormer is built. The fascia will be cut out in front of the dormer and the window will be cut into the first two logs. We're waiting for the non-stop rain to end so we can complete them.

Interior Wall Framing